Skip to Main Content

Service AlertsRider Capacity Restrictions Lifted on ART Buses Starting August 1: Starting Sunday, August 1, rider capacity restrictions will be lifted on all ART buses. Seats inside the buses will no longer be blocked off, and buses will not be limited to a certain number of passengers. If you see an ART bus that has the “Bus Full” sign displayed on the front between now and August 1, please call ART Customer Service at 703-228-7433 and let them know the bus number and route that is full. Operations will look into addressing the issue for service the next day. View all ART Alerts

Service AlertsFederal mask mandate for all transit riders now in effect: By order of the Centers for Disease Control and Prevention (CDC), all transit riders in the United States are now required to wear face masks to curb the spread of COVID-19. For more information, please visit https://www.arlingtontransit.com/about/art-news/face-mask-mandate-for-transit-users-effective-late-february-1/ View all ART Alerts

Service AlertsART 41, 42, 43, 45, 51, 52, 55, 75, 77, 84 and 87 Operating Regular Service: ART 72 is operating a modified weekday schedule. ART 53, 61, 62 and 74 are not operating. Face masks are required on all ART buses. Learn more: ArlingtonTransit.com/Covid19 View all ART Alerts

ART and Metrobus Bus Stop Relocations at Ballston Metro Starting August 1

July 19, 2021

Starting on Sunday, August 1, 2021, ART and Metrobus service at the Ballston Metro station will be relocated due to construction for Phase 2 of the Ballston Multimodal Improvements Project.

Bus stops A, B, C and D along N Stuart Street and bus stop J on N Stafford Street will be closed during the project's second phase of construction. Bus service will be routed to the newly opened bus stops on Fairfax Drive and to temporary bus stops on the west side of N Stuart Street. See the bus stop relocation map and table below.

Construction for Phase 2 is expected to last until Spring 2022.

Ballston Metro Map (English, PDF)

Ballston Metro Map in Spanish (Spanish, PDF)

 

Map of Ballston Metro Station Showing Where Bus Service will be Relocated Starting August 1

Map of Ballston Metro Station showing relocated bus stops

ART Service Being Relocated -- Starting August 1

ART 42, 51 and 52 will be relocated to Temporary Stop 1 located on N Stuart St

ART 72 (North) will be relocated to Temporary Stop 2 located on N Stuart St

ART 72 (South) will be relocated to Bus Bay G located on Fairfax Dr

ART 75 will be relocated to Bus Bay E located on Fairfax Dr

 

Metrobus Service Being Relocated -- Starting August 1

Metrobus 1A, 1B will be relocated to Bus Bay F located on Fairfax Dr

Metrobus 2A will be relocated to Temporary Stop 3 located on N Stuart St

Metrobus 10B and 22A will be relocated to Bus Bay G located on Fairfax Dr

Metrobus 23A, 23B (Crystal City) and 23T (Shirlington) will be relocated to Bus Bay H located on Fairfax Dr

Metrobus 23A, 23T (Tysons) and 38B will be relocated to Temporary Stop 2 located on N Stuart St

Metrobus 25B will be relocated to Bus Bay E located on Fairfax Dr

 

 

 


About User Comments

The User Comments form is a way to share your thoughts with other visitors to this page. If you have a comment or question for Arlington Transit staff, please contact Arlington Transit.

Comments posted here will be published on this page after approval. A valid email address is required to post a comment. Your email address will not be displayed, or used for any purpose except to contact you about your comment or question.