Ballston Station Multimodal Study
Arlington County Department of Environmental Services and Metro have initiated a conceptual study to improve the Ballston Metro plaza and the operation of nearby streets. Although the Metro station area is active and provides many transportation options, these very conditions – in its current configuration – diminish safety and circulation.
The Ballston Station Multimodal Study will identify, analyze, and recommend enhancements that will encourage safer and smoother pedestrian and transit circulation and will improve the design of the plaza for all users.
The study began in Spring 2010 with a data collection and analysis phase. Concept development and evaluation will occur during Summer 2010. In Fall 2010, a preferred concept will be selected, and the study will be complete by the end of 2010.
Detailed area map (PDF, Adobe Reader required)
Study Goals
- Goal: Increase traffic safety, particularly for vulnerable user
• Objective: Decrease conflicts between buses and pedestrians
• Objective: Improve bicyclist safety - Goal: Improve transit circulation around the station
• Objective: Decrease the number of buses parked in non-bus spaces
• Objective: Improve the management of curbside operations - Goal: Improve access and facilities for all users
• Objective: Enhance bus passenger amenities - Goal: Enhance the design and increase the use of public spaces
• Objective: Increase the viability of retail
• Objective: Maximize green space
• Objective: Increase user comfort - Goal: Provide sustainable infrastructure
• Objective: Enhance the attractiveness of transportation choices
• Objective: Provide for low impact development, where possible
Documents
Stakeholder Meeting # 2 on October 5, 2010
Meeting Minutes from Stakeholder Meeting #2, November 12, 2010 (PDF, 92.1 KB, Adobe Reader required)
Presentation at Stakeholder Meeting #2, October 5, 2010 (PDF, 2.23 MB, Adobe Reader required)
Handout from Stakeholder Meeting #2, October 5, 2010 (PDF, 1.22 MB, Adobe Reader required)
Plan Views from Stakeholder Meeting #2, October 5, 2010 (PDF, 7.34 MB, Adobe Reader required)
Typical Intersection Views from Stakeholder Meeting #2, October 5, 2010 (PDF, 122 MB, Adobe Reader required)
Stakeholder Meeting #1 on June 10, 2010
Meeting Announcement for Stakeholder Meeting #1, June 10, 2010 (PDF, Adobe Reader required)
Presentation at Stakeholder Meeting #1, June 10, 2010 (PDF, 2.4 MB, Adobe Reader required)
Handout from Stakeholder Meeting #1, June 10, 2010 (PDF, Adobe Reader required)
Meeting Minutes from Stakeholder Meeting #1, June 10, 2010 (PDF, Adobe Reader required)
Additional Documents
Scope of Work (PDF, Adobe Reader required)
Presentation to Transportation Commission, May 27, 2010 (PDF, 1.7 MB, Adobe Reader required)
More Information
Check back for updates as the study progresses into the Fall.
For more information, please contact Matthew Huston with the Arlington County Transit Bureau.